References

Boiler and Water Intake

Overhaul

SCROLL

NO Customer/Power Plant Major Scope Completion
KOSPO / Busan Power Headquarters Installation work of generator 3 Belly Bend 2009.10
KOWEPO / Taean Power Headquarters Generator 5 SSC & Flux Prob installation work 2009.03
Doosan Heavy Industries & Construction Piping IGL Fabrication Ref G installation work 2011.04
KOWEPO / Pyeongtaek Power Headquarters Installation work of subsidiary facilities of Unit 1 2011.05
GS Power Bucheon Combined Cycle Power Plant Plan #3 Boiler, Fan, Comp', etc. Planned preventive maintenance work 2013.10
KOMIPO / Jeju Power Headquarters Maintenance work such as Hx, Boiler, Fan, Comp' 2013.12
Incheon Total Energy ST Generator Collecting Precision Processing Maintenance Work 2015.10
GS EPS Power Plant #3 CEP Upper Brg' replacement 2015.12
EWP / Dangjin Thermal Power Headquarters Generator 5,6 Fan disassembly and maintenance 2015.12
EWP / Dangjin Thermal Power Headquarters Plan 2 preventive maintenance for water intake and circulation facilities 2016.04
Incheon Total Energy Boiler plan preventive maintenance work (Boiler, Fan , Comp’, etc) 2016.05
EWP / Dangjin Thermal Power Headquarters Comprehensive office building and subsidiary building machinery annual repair work 2016.06
EWP / Dangjin Thermal Power Headquarters Assembling work of turbine 9 equipment (Hx, piping, etc) 2016.06
Korea District Heating Corporation Yongin branch Machinery Equipment Plan Prevention and Maintenance 2017.08
EWP / Dangjin Thermal Power Headquarters Unit 8 Turbine Facility Plan Prevention and Maintenance Work 2018. 05
EWP / Dangjin Thermal Power Headquarters Unit 7 water intake and facility plan preventive maintenance work (TWS, etc) 2018. 07
KOMIPO / Jeju Power Headquarters Mechanical facility maintenance work 2018.10
KOWEPO / Seoincheon Power Headquarters Unit 7 water intake and facility plan preventive maintenance work (Ex Frame & Bearing Cooling Fan, Oil Tank Vaper Fan, etc) 2018.11
KOEN / Youngheung Power Headquarters Unit 3 water intake and facility plan preventive maintenance work (travelling Screen, etc) 2019.04
EWP / Dangjin Thermal Power Headquarters Unit 8 water intake and facility plan preventive maintenance work (SLP TWS, CWP TWS Head Section, etc) 2020.04
KOWEPO / Seoincheon Power Headquarters Unit 6 water intake and facility plan preventive maintenance work (ST Travelling Water Screen & Line, etc) 2020.05
EWP/Dangjin Power Headquarters #7 Absorber Tank Overhaul 2020.11
Komipo/Boryeong Power Headquarters #1 CWP Overhaul 2020.12
GS EPS Power Plant LNG #4 Generator Rotor Railway Construction 2023.02
EWP/Dangjin Power Headquarters #10 Turbine Water Intake Facility Overhaul 2023.05
GS Donghae Power Plant #1 Boiler, Turbine Class B Inspection 2023.06
KDHC/Gimhae Power Headquarters Mechanical Field Overhaul 2023.07
Pyeongtaek Energy Service #2 Generator Fixator Change Work 2023.10
KNP #11, 12 GT Generator Rotor Structure Installation Work 2023.12
KNP Manufacture safety scaffolding and reinforcement for the generator rotor inlet/output structure 2024.02
GS EPS LNG unit 2 GT22 generator rotor inlet railway installation and removal 2024.05
S-Power Co.,LTD Structure for GT generator withdrawal 2024.08